Update ghcr.io/getzola/zola Docker tag to v0.23.4 #36

Open
renovate wants to merge 1 commit from renovate/ghcr.io-getzola-zola-0.x into main
Collaborator

This PR contains the following updates:

Package Type Update Change
ghcr.io/getzola/zola stage patch v0.23.3v0.23.4

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | ghcr.io/getzola/zola | stage | patch | `v0.23.3` → `v0.23.4` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4xMDIuMCIsInVwZGF0ZWRJblZlciI6IjQzLjEwMi4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
Update ghcr.io/getzola/zola Docker tag to v0.23.4
All checks were successful
Build and publish Docker image / build (pull_request) Successful in -12m20s
Check LFS / build (pull_request) Successful in -12m32s
Link Check / check-links (pull_request) Successful in -12m22s
Build and publish Docker image / build (push) Successful in -12m23s
Check LFS / build (push) Successful in -12m32s
Link Check / check-links (push) Successful in -12m25s
7c37aa3a44
Some checks are pending
Build and publish Docker image / build (pull_request) Successful in -12m20s
Check LFS / build (pull_request) Successful in -12m32s
Link Check / check-links (pull_request) Successful in -12m22s
Build and publish Docker image / build (push) Successful in -12m23s
Check LFS / build (push) Successful in -12m32s
Link Check / check-links (push) Successful in -12m25s
Build and publish Docker image
Required
Check LFS
Required
Some required checks are missing.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin renovate/ghcr.io-getzola-zola-0.x:renovate/ghcr.io-getzola-zola-0.x
git switch renovate/ghcr.io-getzola-zola-0.x
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
NewPipe-eV/website-2-0!36
No description provided.